GREEN                       

     AND

        CLEAN

             POWER         

French River Land Company's Website!

 

French River Land Company's Home Page!

 

FRL History

Hydrolec Disassembly

Hydrolec Rebuild

Key Personnel

Machine Shop

News Page

Previous Pictures

Projects

For Sale

HYDROELECTRIC SITES:

Anasagunticook Lake Dam Replacement-    C.Fay & W.Fay

Appleton HEP-     Jim Lichoulas

Badger Pond Dam Removal

Senor Bonifettis' sites in Chile

Buttermilk Hydro

Chittendon Falls

Claytor Dam

Collins Bascule Dam

ESAC WORKS      July 1985

Fiske Mill

1852 Fourneyron

Golden Pond Hydro

Hunts Pond

Jaffery Fire Protection

Lake May Pelton Wheel Removal

Livermore Falls

Martinsville Hydro

OSV

Silk Knitters- Ron Macleod

South Village Dam

Shaker Mill Dam

Tannery Pond

Valatie Falls

Ware River Power's Hydrostations

 

USEFUL ENGINEERING:

The Banki Water Turbine Mockmoore and Merryfield

Bishops Method- STABGM Program

Blade Design-Nechleba

Chain Turbine by: Nguyen Minh Duy

Chain Turbine Mechanics- Discussions with Duy

Design of Small Water Turbines for Farm and Small Communities

Draft Tube Design

Draft Tube Tests

Ejection into Tailraces of Hydropower Plants: S. M. Slisskii

Fall Increaser- Henry Ford

Fall Increaser Herschel Venturi Tube

Fall Increaser Moody Ejector Turbine

Fall Increaser Hydraulic Jump Apron

Flashboard Pins

Gatecase Design- Kovalev

Gatecase Design- Nechleba

Hydraulic Turbines by Arnold Pfau

Hydrostatic Beam Analysis

Impulse Turbines  by Ely Hutchinson

Kaplan Blade Design NACA Air Foil- Report No. 460

Kaplan Blade Design NACA Air Foil- Report No. 628

Kaplan Design- Kovalev

A Laboratory Study to Improve the Efficiency of Crossflow Turbines- N. Aziz & V. Desai

Meggering Generators

Meggering      Earth Resistance

Nechleba

Out Gassing

Parallel Operation of Turbines Analysis

Pelton Design- Daugherty

Pelton Design- Nechleba

Powerhouse Design- Miniwatt Hydro

Powerhouse Design- Natick Dam

Power Plant Inspection

Rake-Leonard

Rake-Newport News

Rack Design-Chicopee-Olav Hotvedt

Rack Design- PHI- Bill Fay

Rack Design-PHI-Brian French

Rack Design-PHI-Ken Smith

Rack Design-ASCE

Rack Design- Hydraulic Institue of Munich

Rack Design-Flow Induced Vibrations

Selecting Hydraulic Reaction Turbines BUREC

Stress Analysis of Hydraulic Turbine Parts, BUREC- F.O. Ruud

Some Fluid Flow Characteristics of a Cross Flow Type Hydraulic Turbine- Durgin & Fay

Tests on a Kaplan Hydraulic Turbine

Theoretical Conditions Related to an Open Channel Flow Linear Turbine- Ishida & Service

Turgo, A High Speed Impulse Turbine- Paul Wilson

Vortices at Intakes

Water Hammer-Lorenzo Allievi-Text

Water Hammer-Lorenzo Allievi-Figures

Water Hammer-ASME Symposium 1933

Water Hammer _ Norman Gibson

Water Hammer-E.B.Strowger

Water Wheel Design- Ken Smith

Weights

Wooden Penstocks

TRADE CATALOUGES:

Brook Waterwheel

Charmilles Turbines

Dayton Globe

Electric Machinery Company (EM)

English Pelton

ESAC

Essex Turbines

GE WW Vert Gen

GE Springbed Brg

Gilkes Turbines

GilkesWaterpower

Holyoke Hercules

Hunt Cat 29 A&B

Hunt cylinder

Kingsbury  Brg

Leffel Bulletin 38

Leffel Bulletin 54

Leffel Hoppes Unit

Leffel Laboratory Unit

Leffel Miscellaneous

Lombard Governor

Pelton Wheel (1909)

Pelton Wheel (1925)

Rodney Hunt

Samson PamK

Smith Power Tables

Smith Kaplan

Smith Power

Smith Pelton

Smith Develop

Smith Turbines: Bulletin 105

Swain Turbine

Tyler Turbine

Vertical Shaft Water Wheel Driven Generators- General Electric

Wellman Seaver Morgan

Westinghouse Small Vertical Waterwheel-Driven A-C Generators, July 1944

Westinghouse WW Generators

Woodward Governor

 

Links:

Swiftriverhydro.com

damengineers.com

 

Claytor Dam Web Page

 

Appalachian Power Company, Radford Limestone Plant, August 5, 1937

Appalachian Power Company, Radford Development No. 6, Discharging Firsr Batch of Concrete, September 1st, 1937

Appalachian Power Company, Radford Development No. 6, First Concrete Train, September 1st, 1937

 

Appalachian Power Company, Radford Development No. 6, Draft Tube Excavation, September 16th, 1937

Appalachian Power Company, Claytor Development, No. 1 Coffer Dam, February 12th, 1938

Appalachian Power Company, Claytor Development, Powerhouse Installation, March 10th, 1938

Appalachian Power Company, Claytor Development, General View of Development, March 17th, 1938

 

Appalachian Power Company, Claytor Development, General View of Development, March 31st, 1938

Appalachian Power Company, Claytor Development, Center Coffer Dam, June 21st, 1938

Appalachian Power Company, Claytor Development, Center Section, September 29th, 1938

Appalachian Power Company, Claytor Development, Intake Area, November 17th, 1938

Appalachian Power Company, Claytor Development, General View of Development, December 5th, 1938

Appalachian Power Company, Claytor Development, General View of Development, March 27th, 1939

Appalachian Power Company, Claytor Development, Runner, October 27th, 1938

Appalachian Power Company, Claytor Development, No. 1 Wicket Gate Installation, November 17th, 1938

 

Appalachian Power Company, Claytor Development, General View of No. 1 Gate Case, December 5th, 1938

Appalachian Power Company, Claytor Development, Installation of Pole Pieces, January 9th, 1939

 

Appalachian Power Company, Claytor Development, Spillway Roller Gate, January 17th, 1939

Appalachian Power Company, Claytor Development, Placing No. 3 Stator, January 23rd, 1939

 

Appalachian Power Company, Claytor Development, Intermediate Level, September 18th, 1939

Appalachian Power Company, Claytor Development, Generating Room, September 18th, 1939

Appalachian Power Company, Claytor Development, Trash Rake, September 18th, 1939

Appalachian Power Company, Claytor Development, Switch Gear, September 20th, 1939

Appalachian Power Company, Claytor Development, Governor Cabinet, September 20th, 1939

Send mail to: cfay@frenchriverland.com with questions or comments about this web site.
Last modified: 07/25/08